Wholesale price stable quality Oil Filter Support to Wellington Factory

Wholesale price stable quality
 Oil Filter Support to Wellington Factory

Short Description:


Product Detail


 

Company Core Philosophy

The company is specialized in casting mould technology design, tooling development, mould   making,gravity casting aluminum alloy products, machining service as a whole, and has 36 seniorr&dengineers. 20 years experience in professional mould making.Strong technical team with certain research and development capabilities.Full machinery focus on quality and after-sales service.

Payment & Delivery

Payment Terms: 30% for deposit, 70% before shipment.

Package Details: usually use the standard 1200*800mm wood pallet, but can customized packaging according to the different products.

Delivery45 days after order confirmation.

jiaotong

Factory Equipment

There are 4 workshops in the company which including tooling workshop, casting workshop , machining workshop ,cleaning workshop and one full-equipped laboratory.

Factory Equipment

Our Certificate

zhengshu

Our Service

liuc

China Foundry Expo

Participate in China Foundry Expo every year.

zhanhui

FAQ

Q:Plant Maturity – Years in service?

A:24 hour

Q:Project Management is existed for new production?

A:Yes,We have

Q:Ownership – Main Share Holders?

A:Private Comp.

Q:Export License and/ or Experience?

A:Yes.

Q:Products Development time?

A:2 Month.

Q:Products Cycle time ?

A:2 Weeks.

 

Product Tags

No matter new customer or old customer, We believe in long term and trusted relationship for Wholesale price stable quality Oil Filter Support to Wellington Factory, As we are moving forward, we keep an eye on our ever-expanding product range and make improvement to our services.


  • Previous:
  • Next:



  • How To get the ball bearings out of a cv shaft This shaft is from a 2004 Chevy Cavalier the bearings are just over 18 mm Dia.



    PART THREE – Sand Casting Process with Philip White and Jenny Dunseath in the foundry at Camberwell college of Art London. Video by Chris Follows part of the Process Arts Project – http://process.arts.ac.uk/ – University of the arts London

    Text Information supplied by Jenny Dunseath:

    11. Take Cope off and set it aside. You should be able to see an imprint of your Pattern. Depending on its location use your hole-cutter and cut a Sprue hole by placing your hand on the back of the Cope and push hole cutter through the other side, twisting slightly.
    12. Widen the Sprue hole on the top of the Cope, to enable the metal to flow. Ensure all edges are smoothed and there is no loose sand.
    13. Tap on the Pattern to loosen, use a screw to take Pattern out.

    14. With a set of Bellows blow out all loose sand, make sure everything is smooth.
    15. Place your flask back together and pour your metal!
    16. After pouring wait for the material to solidify. The amount of time this takes will depend on the size and density of the piece of metal you are creating. Large, dense pieces of metal will take more time to solidify than smaller pieces.

    Related Products

    WhatsApp Online Chat !