Special Price for Bolster Core Pattern for Cairo Manufacturers

Special Price for
 Bolster Core Pattern for Cairo Manufacturers

Short Description:


Product Detail


 

Company Core Philosophy

The company is specialized in casting mould technology design, tooling development, mould   making,gravity casting aluminum alloy products, machining service as a whole, and has 36 seniorr&dengineers. 20 years experience in professional mould making.Strong technical team with certain research and development capabilities.Full machinery focus on quality and after-sales service.

Payment & Delivery

Payment Terms: 30% for deposit, 70% before shipment.

Package Details: usually use the standard 1200*800mm wood pallet, but can customized packaging according to the different products.

Delivery45 days after order confirmation.

jiaotong

Factory Equipment

There are 4 workshops in the company which including tooling workshop, casting workshop , machining workshop ,cleaning workshop and one full-equipped laboratory.

Factory Equipment

Our Certificate

zhengshu

Our Service

liuc

China Foundry Expo

Participate in China Foundry Expo every year.

zhanhui

FAQ

Q:Plant Maturity – Years in service?

A:24 hour

Q:Project Management is existed for new production?

A:Yes,We have

Q:Ownership – Main Share Holders?

A:Private Comp.

Q:Export License and/ or Experience?

A:Yes.

Q:Products Development time?

A:2 Month.

Q:Products Cycle time ?

A:2 Weeks.

 

Product Tags

We rely upon strategic thinking, constant modernisation in all segments, technological advances and of course upon our employees that directly participate in our success for Special Price for Bolster Core Pattern for Cairo Manufacturers, If you are interested in any of our products or would like to discuss a customized order, please feel free to contact us.


  • Previous:
  • Next:



  • Process Design Decisions and Project Economics by Dr. Vijay S. Moholkar,Department of Chemical Engineering,IIT Guwahati.For more details on NPTEL visit http://nptel.ac.in



    This model has the side fairings removed so it can run radious 360 curves, the loco cannot run a standard fleischmann double slip when switched as the long wheel config will not allow this.
    Brawa 0630 my model has Zink cast defects on the boiler , warps and cracks over time , but still a fantastic model.

    Brawa would not replace the defective boiler body as they said it was 16 years old.

    MUSIC : HANS ZIMMER : TIME, BAUDIRAP REMIX

    21-pole interface
    Drive in the locomotive
    Spring buffers
    Finest paintwork and printing
    Bogie with many individually mounted parts
    Finest metal spoked wheels
    Filigree and metal reversing gear
    Metal rods
    Driver’s cab with complete interior fitting
    True-to-original light
    NEM-standard close coupling
    Lacquering into “steel blue”
    Exchangable side covers enable a minimum radius
    Authentic reproduction of brake callipers and brake rods at bottom of locomotive
    Adjustable tender distance

    INFO ABOUT THE ORIGINAL:

    Although the Deutsche Reichsbahn’s colour regulations did not permit it at the time, there were strong rumours that a series 06 locomotive had been painted green. These rumours were confirmed when the green BR 06 models arrived on the market before the Second World War.

    DRG
    Largest German Steam Locomotive

    Year of construction: 1939
    Lenght: 26,52 m
    Velocity: 140 km/h
    Service weight: 141,8 t
    PS: 3500
    kW: 2474

    Related Products

    WhatsApp Online Chat !