Personlized Products Block for Salt Lake City Importers

Personlized Products 
 Block for Salt Lake City Importers

Short Description:


Product Detail


 

Company Core Philosophy

The company is specialized in casting mould technology design, tooling development, mould   making,gravity casting aluminum alloy products, machining service as a whole, and has 36 seniorr&dengineers. 20 years experience in professional mould making.Strong technical team with certain research and development capabilities.Full machinery focus on quality and after-sales service.

Payment & Delivery

Payment Terms: 30% for deposit, 70% before shipment.

Package Details: usually use the standard 1200*800mm wood pallet, but can customized packaging according to the different products.

Delivery45 days after order confirmation.

jiaotong

Factory Equipment

There are 4 workshops in the company which including tooling workshop, casting workshop , machining workshop ,cleaning workshop and one full-equipped laboratory.

Factory Equipment

Our Certificate

zhengshu

Our Service

liuc

China Foundry Expo

Participate in China Foundry Expo every year.

zhanhui

FAQ

Q:Plant Maturity – Years in service?

A:24 hour

Q:Project Management is existed for new production?

A:Yes,We have

Q:Ownership – Main Share Holders?

A:Private Comp.

Q:Export License and/ or Experience?

A:Yes.

Q:Products Development time?

A:2 Month.

Q:Products Cycle time ?

A:2 Weeks.

 

Product Tags

We will devote ourselves to providing our esteemed customers with the most enthusiastically thoughtful services for Personlized Products Block for Salt Lake City Importers, winning customers' trust is the gold key to our success! If you are interested in our products, please feel free to visit our web site or contact us.


  • Previous:
  • Next:



  • St. Luke’s Knisely & Schroeder Facade Replacement

    Berghammer Construction has been selected as the Construction Manager for the re-cladding and façade replacement of the Knisely tower at St. Luke’s Medical Center in Milwaukee, Wisconsin. The existing exterior skin/façade of the Knisely Building (Floors 1 through 8) will be entirely replaced for the entire perimeter of the building. New GFRC panels will be installed over the existing precast panel skin of the existing building on Floors 9 through 12. The existing exterior skin/façade of the three (3) story Schroeder Building will be entirely replaced. Also, this project will be completed in two (2) phases; Knisely Tower in 2012 and the Elevator Tower and Northeast façade of Knisely and Schroeder Building in 2013.

    Related Products

    WhatsApp Online Chat !