Factory directly provide Coupler Drag Pattern Wholesale to Jamaica

Factory directly provide
 Coupler Drag Pattern Wholesale to Jamaica

Short Description:


Product Detail


 

Company Core Philosophy

The company is specialized in casting mould technology design, tooling development, mould   making,gravity casting aluminum alloy products, machining service as a whole, and has 36 seniorr&dengineers. 20 years experience in professional mould making.Strong technical team with certain research and development capabilities.Full machinery focus on quality and after-sales service.

Payment & Delivery

Payment Terms: 30% for deposit, 70% before shipment.

Package Details: usually use the standard 1200*800mm wood pallet, but can customized packaging according to the different products.

Delivery45 days after order confirmation.

jiaotong

Factory Equipment

There are 4 workshops in the company which including tooling workshop, casting workshop , machining workshop ,cleaning workshop and one full-equipped laboratory.

Factory Equipment

Our Certificate

zhengshu

Our Service

liuc

China Foundry Expo

Participate in China Foundry Expo every year.

zhanhui

FAQ

Q:Plant Maturity – Years in service?

A:24 hour

Q:Project Management is existed for new production?

A:Yes,We have

Q:Ownership – Main Share Holders?

A:Private Comp.

Q:Export License and/ or Experience?

A:Yes.

Q:Products Development time?

A:2 Month.

Q:Products Cycle time ?

A:2 Weeks.

 

Product Tags

Our eternal pursuits are the attitude of "regard the market, regard the custom, regard the science" and the theory of "quality the basic, trust the first and management the advanced" for Factory directly provide Coupler Drag Pattern Wholesale to Jamaica, We fully welcome customers from all over the world to establish stable and mutually beneficial business relationships, to have a bright future together.


  • Previous:
  • Next:



  • We are going to erect a building on this flat land.
    We build sheathing and dig deep, deep into the surface.
    We dig up the dirt and begin by erecting a sturdy foundation.
    We should plant bearings on the bedrock to bear the weight (load) of building.
    We install re-bars to join the bearings with the foundation and pour in the concrete!
    Then we install re-bars for the columns and molds for the slabs to build the framework for the first floor.
    The slab will work as the ceiling for the lower level and the floors for the upper level.
    After installing the molds,
    we install re-bars in lattices and pour in the concrete again!
    The molds prevent overfilling.
    The building grows up with the repetition of this process.
    It does not matter how high the building is.
    The materials are transported by tower cranes and temporary elevator hoists
    and the concrete is pumped up with a powerful pump.
    As the building rises, the lower levels install glass walls on the exterior
    and add electrical systems and finishes on the inside.
    A big team of people works on different levels at the same time to complete the building!
    Wow! We have completed a great shiny building!
    Buildings connect worlds and people.
    Hyundai E&C builds with the world’s greatest technology!
    Go to Hyundai E&C Construction Story | Building : http://en.hdec.kr/EN/Business/ConstructionStory.aspx

    Related Products

    WhatsApp Online Chat !