Cheapest Factory Broke Rod for South Africa Factories

Cheapest Factory
 Broke Rod for South Africa Factories

Short Description:


Product Detail


 

Company Core Philosophy

The company is specialized in casting mould technology design, tooling development, mould   making,gravity casting aluminum alloy products, machining service as a whole, and has 36 seniorr&dengineers. 20 years experience in professional mould making.Strong technical team with certain research and development capabilities.Full machinery focus on quality and after-sales service.

Payment & Delivery

Payment Terms: 30% for deposit, 70% before shipment.

Package Details: usually use the standard 1200*800mm wood pallet, but can customized packaging according to the different products.

Delivery45 days after order confirmation.

jiaotong

Factory Equipment

There are 4 workshops in the company which including tooling workshop, casting workshop , machining workshop ,cleaning workshop and one full-equipped laboratory.

Factory Equipment

Our Certificate

zhengshu

Our Service

liuc

China Foundry Expo

Participate in China Foundry Expo every year.

zhanhui

FAQ

Q:Plant Maturity – Years in service?

A:24 hour

Q:Project Management is existed for new production?

A:Yes,We have

Q:Ownership – Main Share Holders?

A:Private Comp.

Q:Export License and/ or Experience?

A:Yes.

Q:Products Development time?

A:2 Month.

Q:Products Cycle time ?

A:2 Weeks.

 

Product Tags

Reliable quality and good credit standing are our principles, which will help us at a top-ranking position. Adhering to the tenet of "quality first, customer supreme" for Cheapest Factory Broke Rod for South Africa Factories, We welcome you to inquire us by call or mail and hope to build a successful and cooperative relationship.


  • Previous:
  • Next:



  • DIY project. Adding a small can of refrigerant R22 into a stationary A/C system. This is a commercial style self-contained package unit, but its essentially the same with every unit.

    The valve should be attached to the can first, screwed all the way in, then cracked a bit to clear the hose of air. connect to low-side port. DO NOT attach to high side. If you do, the can might burst.

    Charge upright, so that the liquid doesn’t go in to slug the compressor. If liquid R22 is fed into the compressor and the piston tries to compress liquid, you might wreck it.

    It will take five minutes or more a can and the can will start to get cold as the refrigerant evaporates out of the can and into the system. Feel free to use a hot water bath.

    Use a heat blanket, or a bath of hot water to help the charging process.

    To replace the can, re-tighten then valve, unscrew the valve assembly from the can, then remove the bracket. (DO NOT loosen the valve, or you’ll vent the charge from system into the air

    Attach bracket to can, tighten down the valve assembly into the can and loosen valve to continue charging.

    The can is empty when it is nearly as warm as the heating bath.



    interlocking paver tile machine
    paver tile moulds colors 8892989983,9902709466

    Related Products

    WhatsApp Online Chat !